Analisis Waktu Kerja untuk Penentuan Kebutuhan Tenaga Kerja dalam Memenuhi Permintaan di CV. Barokah Metal Sidoarjo
DOI:
https://doi.org/10.37859/jst.v12i1.9347
Abstract
CV. Barokah Metal is a business engaged in the motorcycle spare parts manufacturing industry in the form of planers. Every day it is targeted to produce 60 dozen. However, sometimes consumer demand cannot be met. One of the reasons for not meeting the target is influenced by the performance and consistency of each worker, so it is necessary to determine the standard time using the stopwatch time study method in order to maximize workers in completing their work. After calculating, the standard time for operator 1 was 34.17 seconds, operator 2 33.89 seconds, operator 3 11.49 seconds, operator 4 38.96 seconds, operator 5 7.66 seconds, operator 6 46.40 seconds, operator 7 25.39 seconds, operator 8 33.17 seconds, and operator 9 60.45 seconds. The number of workers needed to meet the demand is 12 people, by adding 1 worker each for operator 4, operator 6 and operator 9.
Downloads
References
Wignjosoebroto S. Ergonomi Studi Gerak dan Waktu. Guna Widya. 2000.
Y. Nurdiansyah, H. Satoto. Optimasi Waktu Standar Kerja Menggunakan Metode Stopwatch Time Study. JURMATIS. 2023, Vol. 5 No. 1 Januari 2023: hal 59-68.
Sutalaksana, Anggawisastra, Tjakraatmadja. Teknik Perancangan Sistem Kerja. Edisi Kedua. Institut Teknologi Bandung. 2006
M. Pane, H. Satoto. Penentuan Waktu Standar Guna Memaksimalkan Kapasitas Produksi Produk Media Tanam. Jurnal Taguchi. 2023, Vol.3 No. 1 Juli 2023: hal 308-314.
D. Andris, H. Satoto. Analisis Waktu Standar Dalam Penentuan Jumlah Tenaga Kerja Pada Produksi Cage Wheel Dengan Metode Stopwatch Time Study (Studi Kasus: CV. Lancar Jaya). Jurnal Taguchi. 2023, Vol.3 No. 1 Juli 2023: hal 371-380.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Nayla Ayu Ramadhaniyah, Handy Febri Satoto

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.