The study was conducted at PT XYZ, a manufacturing company engaged in the production of yarn using a make-to-stock production system. The problem faced by the company is the failure to achieve consistent production due to suspected imbalances in operator workloads at several workstations. This study aims to analyze operator workload levels and determine optimal workforce requirements using the Cardiovascular Load (CVL) and Work Load Analysis (WLA) methods. The CVL method was used to determine the workload levels experienced by operators, derived from work heart rate and resting heart rate, while WLA was used to calculate the optimal number of operators based on working time. Research data was obtained through direct observation, work time measurements, and measurements of operators’ heart rates during the production process. The results indicate the presence of operators with high workload levels as well as an imbalance in the number of workers at several workstations, resulting in the production process not yet operating optimally. Therefore, adjustments to the number of workers and a more balanced division of labor are necessary to improve the company’s productivity.
Downloads
References
G. J. P. Ivan, N. Budiharti, Dan S. A. Sari, “Penentuan Jumlah Tenaga Kerja Berdasarkan Beban Kerja Karyawan Di Pt. Xyz,” Vol. 8, No. 2, 2025.
Komang Budiasa, Beban Kerja Dan Kinerja Sumber Daya Manusia. 2021.
A. A. Lubis Dan M. T. Safirin, “Analysis Of Physical And Mental Workload Of Workers With Cardiovascular Load (Cvl) And Bourdon Wiersma At Pt Xyz”.
B. A. Prabowo Dan J. Purnama, “Penentuan Jumlah Tenaga Kerja Untuk Mengptimalkan Produktivitas Pada Produk Tungku Kompor (Studi Kasus Pada Pt. Elang Jagad Di Sidoarjo)”.
B. Ramadani Dan Siti Muhimatul Khoiroh, “Analisis Beban Kerja Pada Bagian Produksi Paving Guna Mengoptimalkan Jumlah Produksi Pada Pt. Pesona Arnos Beton Di Gresik,” J. Surya Tek., Vol. 11, No. 1, Jun 2024, Doi: 10.37859/Jst.V11i1.7073.
A. Y. Pradana Dan F. Pulansari, “Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz,” Juminten, Vol. 2, No. 1, Hlm. 13–24, Jan 2021, Doi: 10.33005/Juminten.V2i1.217.
A. B. R. Syapujagat Dan S. Mundari, “Analisis Beban Kerja Untuk Menentukan Jumlah Tenaga Kerja (Studi Kasus Ud. Bangkit Bersama)”.
D. Diniaty, “Penentuan Jumlah Tenaga Kerja Berdasarkan Waktu Standar Dengan Metode Work Sampling Di Stasiun Repair Overhoul Gearbox (Studi Kasus: Pt. Imeco Inter Sarana),” J. Tek. Ind. J. Has. Penelit. Dan Karya Ilm. Dalam Bid. Tek. Ind., Vol. 3, No. 1, Hlm. 1, Agu 2018, Doi: 10.24014/Jti.V3i1.5557.
V. H. Abdillah Dan J. Purnama, “Penentuan Jumlah Tenaga Kerja Pada Proses Pembuatan Batu Bata Dengan Metode Work Load Analysis (Wla) Guna Memenuhi Permintaan,” No. 10.
Y. Fernanda, J. Hutabarat, Dan K. Kiswandono, “Analisa Beban Kerja Dengan Pendekatan Workload Analysis (Wla) Untuk Menentukan Jumlah Tenaga Kerja Yang Optimal Pada Industri Dupa,” J. Valtech, Vol. 6, No. 2, Hlm. 252–257, Des 2023, Doi: 10.36040/Valtech.V6i2.7407.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Evi Hidayati, Jaka Purnama

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.