Analisis Waktu Standar Produksi dengan Stopwatch Time Study Guna Penentuan Jumlah Tenaga Kerja

Authors

  • Alfan Ridho Alfan Universitas 17 Agustus 1945 Surabaya
  • Erni Puspanantasari Putri Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.37859/jst.v12i1.9379
Keywords: Standard Time, Working Time Measurement, Number of Workers, Stopwatch Time Study

Abstract

UD Logam Abadi is a manufacturing company that produces accessories for PLN and Telkom, one of which is the Suspensen Q spare part. The company is experiencing difficulties due to the lack of a standard working time, resulting in workers not having daily targets, which impacts the achievement of production volume. Fluctuating market demand and the manual assembly process make the role of labor very important. This research aims to determine the standard production time and the optimal number of workers using the Stopwatch Time Study method. The research results indicate that the standard time to complete one unit of Suspensen Q is 550.49 seconds or about 9.16 minutes. The optimal number of workers needed is 2 to 3 per division.

Downloads

Download data is not yet available.

Author Biographies

Alfan Ridho Alfan, Universitas 17 Agustus 1945 Surabaya

Program Studi Teknik Industri, Fakultas Teknik

Erni Puspanantasari Putri, Universitas 17 Agustus 1945 Surabaya

Program Studi Teknik Industri, Fakultas Teknik

References

Gunawan, R., & Wahyudin, W. (2022). Usulan Penentuan Waktu Baku Metode Jam Henti Pada Proses Pengemasan Produk Kangkung Akar 250gr. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 8(2), 223. https://doi.org/10.24014/jti.v8i2.19631

Hanafie, A., Haslindah, A., & Suradi, S. (2022). Penerapan Waktu Kerja Dengan Metode Pengukuran Kerja Secara Langsung Pada Proses Pembuatan Putu. ILTEK : Jurnal Teknologi, 17(02), 130–135. https://doi.org/10.47398/iltek.v17i02.22

Humam, M. H., Elektronika, T., & Tunggal, P. G. (2025). Merancang Bangun Aplikasi Scanner Sebagai Penginputan Data Identitas Pada Gedung PT . HSH Menggunakan Teknologi OCR. 5(1).

Kajian, J., Tahun, N., Pamungkas, D. H., Huda, M. S., Septiawan, R., Prasetya, J., Robby, R. A., & Yuamita, F. (2025). Optimisasi Systematic Layout Planning dan Perbandingan Work Sampling untuk Efisiensi Waktu Produksi di UD Cantenan Planning sangat dibutuhkan untuk mengoptimalkan pengaturan ruang dan aliran material di yang memakan waktu lama , aliran proses kerja yang t. 285–306.

Sekarningsih, P. E., & Hadining, A. F. (2022). Analisis Pengukuran Kerja Dalam Menentukan Waktu Baku Pada Operator Mesin Broaching Dengan Metode Pengukuran Waktu Jam Henti (Studi Kasus: PT XYZ). Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 8(2), 175. https://doi.org/10.24014/jti.v8i2.19936

Downloads

Published

2025-06-30

How to Cite

[1]
A. R. Alfan and E. P. . Putri, “Analisis Waktu Standar Produksi dengan Stopwatch Time Study Guna Penentuan Jumlah Tenaga Kerja”, JST, vol. 12, no. 1, pp. 399–410, Jun. 2025.

Issue

Section

Research Article