Pengukuran Waktu Kerja untuk Menentukan Jumlah Tenaga Kerja Optimal pada Pembuatan Neon Box
Studi Kasus: CV. Wibisono Kreatif Media
DOI:
 https://doi.org/10.37859/jst.v12i1.9366
 
							
								https://doi.org/10.37859/jst.v12i1.9366
							
						
					Abstract
CV Wibisono Kreatif Media is a company engaged in the advertising industry (media advertising), construction, and general printing. CV. Wibisono Kreatif Media produces various products, ranging from neon boxes, flexible neon, embossed letters, sign boards, pylon totems, banner printing, sticker printing, and many more. CV Wibisono Kreatif Media also serves shipping and installation to all regions in Indonesia. The problem that arose was the production of CV Wibisono Kreatif Media neon boxes that did not meet the production target. Using the Time Study and Workload Analysis approach, the results showed the need for an efficient number of workers, which is only 5 workers; there will be 1 worker for the cutting operator, the number of workers for the lamp installation operator decreased from 2 to 1, the assembly operator for the neon box also reduced from 2 workers to 1 worker, then the framework making operator decreased from 2 workers to 1 worker, and finally, the sticker installation and finishing operator remains at 1 worker.
Downloads
References
Abdi H, Herlina H. Studi Waktu Kerja untuk Meningkatkan Produktivitas Kerja pada Pembuatan Upper Sandal. J Tek Ind Terintegrasi. 2023;6(3):501–13.
Triannisa R, Dewi S. Penentuan Tenaga Kerja Optimal Pada Stasiun Pengemasan PT. PQRS Berdasarkan Perhitungan Waktu Standart Metode Work Sampling. J Tek Ind Terintegrasi. 2024;7(1):282–9.
Pradana AY, Pulansari F. Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten. 2021;2(1):13–24.
Fernanda Y, Hutabarat J. Analisa Beban Kerja Dengan Pendekatan Workload Analysis (WLA) Untuk Menentukan Jumlah Tenaga Kerja Yang Optimal Pada Industri Dupa. J Valtech (Jurnal Mhs Tek Ind. 2023;6(2):252–7.
Firnanda RA, Murnawan H. Penentuan Jumlah Tenaga Kerja pada UD Surya Sejati dengan Metode Workload Analysis ( Wla ). 2023;1384–99.
Aldiansyah MR, Kusnadi K. Analisis Beban Kerja dan Jumlah Pekerja Menggunakan Metode Workload Analysis (Studi Kasus: PT. Metal Stamping). J Tek. 2023;21(1):68–76.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Muhammad Yunizar Arfiansyah, Herlina Herlina, Istantyo Yuwono

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
 
						 
							






 
 











