Perencanaan Kebutuhan Bahan Baku Komponen Produk Bak Dump Truk Studi Kasus di PT. Ragam Mulya Abadi
DOI:
https://doi.org/10.37859/jst.v11i1.7071
Abstract
PT. Ragam Mulya Abadi, a company that produces dump truck bodies, located on Jalan Raya Menganti, Surabaya. Problems that occur in planning materials and dump truck body components are due to inappropriate production planning so that product delivery to consumers is delayed. The aproach by using Chase Strategy method used to determine production planning, then the solution is carried out using the MRP system using Lot for Lot method and it is found more economical with results of Rp. 536,550,- while with the FPR method the results obtained were Rp. 5,930,925,-. In conclusion, with the Lot for Lot method the company can save costs of Rp. 5,394,375,- compared to using FPR method. The suggestion is that companies should consider using the Lot for Lot system in procuring components for dump truck body production because it minimizes costs for the company and hoped the research results can meet future demand.
Downloads
References
Gaspersz, V. Production Planning and Inventory Control Berdasarkan Pendekatan Sistem Terintegrasi MRP II dan JIT Menuju Manufakturing 21. Cetakan kedua edisi revisi dan perluasan. 2001. Jakarta.
Rizky, F. N. N. 2019, Analisis Peramalan Penjualan Dalam Rangka Menentukan Perencanaan Produksi Sepatu Kulit Pada PT. Brodo Ganesha Indonesia, Skripsi, 2019 Universitas Pasundan, Bandung
Chandradevi, A. dan Puspitasari, N. B. 2016, Penerapan Material Requirement Planning (MRP) dengan Mempertimbangkan Lot Sizing dalam Pengendalian Bahan Baku pada PT. Phapros, Tbk., Performa, Vol. 15, No. 1, Hal 77-86.