Analisis Pengurangan Waste Proses Produksi pada PT SP Manufacturing
DOI:
https://doi.org/10.37859/jst.v11i1.6605
Abstract
PT SP Manufacturing is a manufacturing company that operates in the field of wire harness production. When making wire harnesses at PT SP Manufacturing, waste still occurs. Waste in the production process is one of the biggest problems this company wants to solve. A defective product is a product that does not meet wire harness production standards so it cannot meet customer demand, and requires more space before rework is carried out, which causes inventory waste (Unnecessary Inventory). Reduced productivity and higher production costs are the result of this waste. The aim of this research is to use value stream mapping to identify waste in the production process and apply lean manufacturing techniques to reduce it. The results obtained are based on identification and analysis of existing problems as well as alternatives and improvements based on the formulation and objectives in the research. The largest waste in the wire harness production process of PT.SP Manufacturing is waste with a weight score of 60.89%, unknown inventory waste with a weight score of 39, 12%. The causal factors are workers who lack concentration, apply excess solder paste to the wire terminals, workers who pursue targets without paying attention to quality, resulting in defective products that require rework. The recommendations given to the company according to the fishbone diagram are proposed improvements to the wire harness production process to reduce defects and unnecessary inventory which refers to people, machines, methods and materials.
Downloads
References
Rifaldo, M. M., & Abryandoko, E. W. (2023). Analisis Pemborosan Waktu Produksi Pada Proses Pembuatan Melting Pot Menggunakan Pendekatan Lean Di Pt . Karya Ilham Mandiri Analysis Of Production Time Waste In The Melting Pot Making Process Using A Lean Approach At Pt . Karya Ilham Mandiri. Jurnal Teknologi dan Manajemen Sistem Industri (Jtmsi), 2(September), 82–89.
Ismail, N. E.-H., Sutomo, A. N. N., & Muchtaridi, M. (2023). Analysis Of Waste Minimization In Production Time To Increase Production Effectiveness. Indonesian Journal Of Pharmaceutical Science And Technology, 10(1), 31.
https://doi.org/10.24198/ijpst.v10i1.34905
Suharjo, & Sudiro, S. (2018). Pengurangan Pemborosan Pada Proses Produksi Menggunakan Wrm, Waq Dan Valsat Pada Sistem Manufaktur. Jurna Lilmiah Teknobiz, 8(2), 291–302.
Putri Manalu, Rosdiana, and Rizki Prakasa hasibuan. 2022. “ANALISA LEAN MANUFACTURING PRODUKSI THERMOPHILE PADA PT X”. Computer and Science Industrial Engineering (COMASIE) 7 (3):25-34. https://ejournal.upbatam.ac.id/index.php/comasiejournal/article/view/5972
Anugrah, M., & Emsosfi, R. Z. (2019). Usulan Pengurangan Waste Proses Produksi Menggunakan Waste Asessment Model Dan Value Stream Mapping Di Pt . X. Jurusan Teknik Industri Itenas, 4(01), 110–120.
Febrian, A. (2023). Penerapan Lean Manufacturing Dengan Metode Value Stream Mapping Untuk Mengurangi Waste. Journal Of Industrial And Systems Engineering, 4(1), 1–3.
Fauziah Amelia Ananda, & Sutopo, W. (2020). Analisis Masalah Untuk Menentukan Minimasi Waste Pada Proses Produksi Di Pt. Xyz. Teknoin, 26(2), 141–153. https://doi.org/10.20885/teknoin.vol26.iss2.art5
















