Analisis Efektivitas Gas Turbine Generator pada PT Mitra Energi Batam

  • Nur Azila Program Studi Teknik Industri, Fakultas Teknik, Universitas Putera Batam
  • Elsya Paskaria Loyda Tarigan Program Studi Teknik Industri, Fakultas Teknik, Universitas Putera Batam
Keywords: Gas Turbine Generator, OEE, Six Big Loss, Fishbone diagram

Abstract

PT Mitra Energi Batam is one of the Gas Power Plants (PLTG) and regulates the electricity supply of Batam city with PT PLN-Batam. According to the tabulation of PT Mitra Energi Batam's production data from September 2022 to September 2023, the rolls-royce Gas Turbine Generator production engine has a downtime value of 805.60 hours. The purpose of the study is to find out the factors that cause high downtime and know how to minimize it. Using the proposed Overall Equipment Effectiveness method as a way to measure Losses due to production disruptions by taking six big loss and Fishbone diagrams to find the cause and effect of Losses that cause failure of machine or equipment operations. The results of the study of the highest OEE value in August 2023 were 98.54%, the lowest OEE value was in April 2023 which was 0%, the cause was severe damage to the power turbine blade which required engine replacement, but was constrained by the time of the engine spare delivery process. The six big Losses factor that contributed the most to the OEE value was idling minor stoppage with an average value of 8.83% and equipment failure Losses with an average value of 8.81%.

Downloads

Download data is not yet available.

References

M. Sayuti and S. Maulinda, “Analisis Efektivitas Gas Turbine Generator dengan Metode Overall Equipment Effectiveness,” Jurnal INTECH Teknik Industri Universitas Serang Raya, vol. 5, no. 1, p. 7, Jul. 2019, doi: 10.30656/intech.v5i1.1463.

G. Sirait, “Peningkatan Efektivitas Generator Turbin Gas Dengan Pendekatan Overall Equipment Efectiveness Pada PT Mitra Energi Batam,” JURNAL COMASIE, vol. 3, no. 5, 2020.

M. B. Anthony, “Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (OEE) Dan Six Big Losses Pada Mesin Cold Leveller PT. KPS,” vol. 2, no. 2, pp. 94–103, 2019.

M. Musyafa’ah and A. Sofiana, “Analysis of Total Productive Maintenance (TPM) Application Using Overall Equipment Effectiveness (OEE) and Six Big Losses on Disamatic Machine PT. XYZ,” OPSI, vol. 15, no. 1, p. 56, Jun. 2022, doi: 10.31315/opsi.v15i1.6630.

Z. Tian Xiang and C. Jeng Feng, “Implementing total productive maintenance in a manufacturing small or medium-sized enterprise,” Journal of Industrial Engineering and Management, vol. 14, no. 2, p. 152, Feb. 2021, doi: 10.3926/jiem.3286.

D. Sukma and H. A. Prabowo, “Implementation of Total Productive Maintenance to Improve Overall Equipment Effectiveness of Linear Accelerator Synergy Platform Cancer Therapy,” International Journal of Engineering, vol. 35, no. 7, pp. 1246–1256, 2022, doi: 10.5829/IJE.2022.35.07A.04.

L. Van De Ginste, E.-H. Aghezzaf, and J. Cottyn, “The role of equipment flexibility in Overall Equipment Effectiveness (OEE)-driven process improvement,” Procedia CIRP, vol. 107, pp. 289–294, 2022, doi: 10.1016/j.procir.2022.04.047.

S. Thiede, “Advanced energy data analytics to predict machine overall equipment effectiveness (OEE): a synergetic approach to foster sustainable manufacturing.,” Procedia CIRP, vol. 116, pp. 438–443, 2023, doi: 10.1016/j.procir.2023.02.074.

A. Rahman and S. Perdana, “Analisis produktivitas mesin percetakan perfect binding dengan metode OEE dan FMEA,” Jurnal Ilmiah Teknik Industri, vol. 7, no. 1, 2019.

A. Rahman and S. & Perdana, “Analisis Produktivitas Mesin Percetakan Perfect Binding Dengan Metode OEE Dan FMEA,” Jurnal Ilmiah Teknik Industri , vol. 7, no. 1, 2019.

J. Gianfranco, “Pengukuran Total Productive Maintenance (TPM) Menggunakan Metode Overall Equipment Effectiveness (OEE) Pada Mesin Reaktor Produksi.,” Jurnal Lebesgue: Jurnal Ilmiah Pendidikan Matematika, Matematika dan Statistika, vol. 3, no. 1, 2018.

W. H. Afiva, F. T. D. Atmaji, and J. Alhilman, “Usulan Interval Preventive Maintenance dan Estimasi Biaya Pemeliharaan Menggunakan Metode Reliability Centered Maintenance dan FMECA,” Jurnal Ilmiah Teknik Industri, vol. 18, no. 2, pp. 213–223, Dec. 2019, doi: 10.23917/jiti.v18i2.8551.

T. J. Weidner, “Planned maintenance vs Unplanned maintenance and facility costs,” IOP Conf Ser Earth Environ Sci, vol. 1176, no. 1, p. 012037, May 2023, doi: 10.1088/1755-1315/1176/1/012037.

N. Fajrah and N. Noviardi, “Analisis Performansi Mesin Pre-Turning dengan Metode Overall Equipment Effectiveness pada PT APCB,” Jurnal Optimasi Sistem Industri, vol. 17, no. 2, pp. 126–134, Oct. 2018, doi: 10.25077/josi.v17.n2.p126-134.2018.

Published
2023-12-26
How to Cite
Nur Azila, & Elsya Paskaria Loyda Tarigan. (2023). Analisis Efektivitas Gas Turbine Generator pada PT Mitra Energi Batam. Jurnal Surya Teknika, 10(2), 834-841. https://doi.org/10.37859/jst.v10i2.6296
Abstract views: 85 , *.pdf downloads: 69