Penentuan Waktu Baku untuk Proses Pengelolaan Limbah B3 di PT XYZ
DOI:

Abstract
PT XYZ is a manufacturing company in the automotive sector that produces vehicles and their components. Its production process generates hazardous and toxic (B3) waste classified as fast moving due to its high volume and frequency. This study aims to determine the standard time for the management process of iron gram B3 waste at PT XYZ. Observations were conducted over 15 cycles, with time recorded at each stage using the stopwatch time study method and adjustments based on the Westinghouse technique. The study was carried out across eight stages of the B3 waste management process at PT XYZ, involving calculations of cycle time, normal time, and standard time. The analysis revealed that the total standard time for the entire process is 42 minutes and 18 seconds. Establishing this standard time supports improved efficiency, prevents waste accumulation, and creates a more structured waste management system that can be periodically evaluated.
Downloads
References
Afghoni, T. F., Prasetya, D. I., & Suwarno, A. (2024). Analysis of Standard Time Calculations Using the Direct Stopwatch Time Study Method on Line Deburing PT. Mikuni (Doctoral dissertation, Universitas Pelita Bangsa).
Ashley, B. A., & Mahachandra, M. (2023). Penentuan Jumlah Tenaga Kerja Optimal Berdasarkan Waktu Baku dengan Metode Work Sampling Pada Stasiun Kerja Scouring-Bleaching (Studi Kasus: PT XYZ). Industrial Engineering Online Journal, 12(4).
Azhar, M. F. A. M., Ahmad, A. H., Jamaludin, M. H., Azlina, S., & Osman, S. A. O. (2024). Enhancing Operational Efficiency through Stopwatch Time Study: A Systematic Approach for Performance Evaluation. Journal of Advanced Research in Applied Sciences and Engineering Technology, 60(1), 253-264.
Fajriyah, S. A., & Wardhani, E. (2020). Evaluasi Pengelolaan Limbah Bahan Berbahaya dan Beracun (B3) di PT X. Serambi Engineering, 5(1), 2541-1934.
Hartanti, L. P. S. (2016). Work Measurement Approach to Determine Standard Time in Assembly Line. International Journal of Management and Applied Science, 2(10), ISSN: 2394-7926.
Imami, A. D., & Rahmah. (2022). Studi Pengelolaan Limbah Bahan Berbahaya dan Beracun (B3) di Kawasan Pelabuhan Batu Bara (Studi Kasus: PT X di Sumatera Selatan). Journal of Science, Technology, and Virtual Culture, 2(2), 2807-7997.
Muti, A. (2022). Determinasi Patokan Waktu Pabrikasi Dengan Stopwatch Time Study (Studi Kasus Cemilan Sbr). Jurnal Rekayasa Sistem Industri. 8(1), 36-40.
Nevenda, M., Wulandari, L. M. C. (2023). Analisis Perhitungan Waktu Standart Untuk Menentukan Jumlah Tenaga Kerja Optimal Pada Proses Produksi PT. NRZ Prima Gasket. Satukata: Jurnal Sains, Teknik, dan Studi Kemasyarakatan, 1(5), 211-222.
Panudju, A. T., Marfuah, U., Mutmainah. (2021). The Measurement of Standard Time for Analysis of Output Standards in the E-Commerce Process. International Journal of Research and Innovation in Applied Science Vol VI, Issue V
Pasaribu, S. A., Wahyudi, R., & Nugraha, A. T. (2023). Penentuan Waktu Baku Pada Proses Pembuatan Paving Block Berjenis Bata (Studi Kasus: CV. Karya Mandiri Sejahtera Bandar Lampung). Sistem: Jurnal Ilmu-Ilmu Teknik, 19(2), 12-20.
Purbasari, A., & Reginald. (2020). Pengukuran waktu baku pada proses pemasangan IC program menggunakan metode jam henti. Profisiensi, 8(2), 116-128.
Rosyidi, M. R., Izzah, N. (2024). Use of Work Sampling to Determine Standard Time in Sales Outlet Performance: A Case Study. Journal Terapan Informatika Nusantara Vol 4, No 10.
Sari, E. M., Darmawan, M. (2020). Measurement of Standard Time and Analysis of Workloads in The Filling Process and Packing of Shower Scrub Products at PT. Gloria Origita Cosmetics. Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa & Inovasi 2.1
Senavirathna, M. S. D., Senathiraja, R. (2023). Standard Time in Operations Management. University of Colombo: Sri Lanka
Setiadewi, E., Widowati, I., & Negara, L. J. (2020). Analisa Waktu Baku Proses Pemasangan Interior Unit Model Grand Livina di Section Chassis Line Departemen Trim Chassis PT. Nissan Motor Indonesia. STT Wastukancana: Purwakarta.
Siswanto, S., Widodo, E. M., & Rusdjijati, R. (2021). Perancangan Alat Pengupas Salak dengan Pendekatan Ergonomi Engineering. Borobudur Engineering Review, 1(1), 25-38.
Wahyudi, R. Nugraha, A. T., Kinasih, A. S. (2023). Penentuan Waktu Baku dengan Stopwatch Time Study untuk Pengukuran Kerja Operator di PT XYZ Lampung Tengah. Journal of Industrial Engineering: Application and Research Volume 03 No. 02.
Wangchuk, S., & Madan, A. K. (2023). Stopwatch method for assembly line production. International Journal of Advances in Engineering and Management (IJAEM), 5(1), 39–45.
Yurnalisdel, Y. (2023). Analisis pengelolaan limbah bahan berbahaya dan beracun (B3) di Indonesia. Jurnal Syntax Admiration, 4(2), 201-208.
Zadry, H. (2015). Analisis dan Perancangan Sistem Kerja. Padang: Andalas. University Press.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Prima Fithri, Fahran Zofri, Alfadhlani Alfadhlani, Ranti Mustika Putri

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.