Relayout Area Divisi Oven dengan Metode Systematic Layout Planning (SLP) PT. XYZ
Abstract
PT. XYZ is a manufacturing company engaged in the production of notebooks and chemicals. This study aims to improve production efficiency in the oven division of PT. XYZ, especially on the SS-29 oven machine, by implementing the Lean Manufacturing and Systematic Layout Planning (SLP) methods. This study begins with an analysis of initial conditions that show various wastes, including excess material transfer, waiting time, and inefficient operator movements. The SLP approach is used to analyze the initial layout and design alternative new layouts by considering the results of the Activity Relationship Chart (ARC) and space requirements. Lean Manufacturing functions to identify and reduce activities that do not provide added value in the production process. The results of implementing the new layout show a reduction in material transfer distance by 41.12%, which has a direct impact on time and energy efficiency. In addition, production cycle time is significantly reduced, increasing operator productivity. This new layout also reduces waste in terms of waiting and transportation, while supporting a more responsive workflow. As a recommendation, PT. XYZ needs to immediately implement a new layout by considering implementation costs and impacts on ongoing operations. Continuous adjustment of the layout is also recommended to ensure the solution remains relevant, as well as to serve as a basis for further research in evaluating long-term impact and implementation in other divisions.
Downloads
References
Apple, J. M. (1990). Plant Layout and Material Handling. New York: John Wiley & Sons.
Gasperz, V. (2007). Lean Six Sigma for Manufacturing and Service Industries. PT Gramedika Pustaka Utama.
Haikal, M. F. ., & Satoto, H. F. . (2023). Perancangan kandang puyuh otomatis dengan menggunakan metode qfd (quality function development) di umkm bibit puyuh sidoarjo . Jurnal Ilmiah Teknik Dan Manajemen Industri, 3(2), 1024–1034.
https://doi.org/10.46306/tgc.v3i2.209
Hines, P., & Rich, N. (1997). The seven Value Stream Mapping tools. International Journal of Operations & Production Management, 17(1), 46-64. [5] Hines, P., & Taylor, D. (2000). Going Lean. Lean Enterprise Centre.
Kartika, L., & Dony, S. (2019). Penerapan Lean Manufacturing untuk mengidentifikasi waste pada proses produksi kain knitting di lantai produksi PT. XYZ. Prosiding Industrial Research Workshop and National Seminar, 10(1), 567-572.
Kharisma, B., & Satoto, H. F. (2024). Relayout gudang fitting pipa dengan metode shared storage di pt. Tjakrindo mas. Jensitec, 10(02), 1014–1021. https://doi.org/10.31949/jensitec.v10i02.9247
Muther, R., & Hales, L. (2015). Systematic Layout Planning. Management & Industrial Research Publications.
Rohac, T., & Januska, M. (2015). Value stream mapping demonstration on real case study. Procedia Engineering, 100, 520-529.
Rother, M., & Shook, J. (2003). Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. The Lean Enterprise Institute.
Sitohang, E. P., & Norita, D. (2015). Analisa gerak dan waktu kerja sampel inkubasi teh botol sosro kemasan kotak. Jurnal PASTI, 9(1), 83-101. [12] Wignjosoebroto, S. (2009). Pengantar Teknik Industri. Surabaya: Guna Widya.
Copyright (c) 2024 Akilla Alfrets Deanoffa Gunawan, Handy Febri Satoto

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.