The need for electrical energy affects the loading of the transformer which can result in overloading of more than 80%. PLN Standard No. 50 of 1997 states that a transformer is said to be overloaded if the load is more than 80%. This research aims to determine the effect of loading on transformer efficiency and voltage drop on distribution transformers. For loading on transformers before uprating, the results were 92.143%. The voltage drop percentage value obtained for each phase R, S, T is 11.121%, voltage drop percentage on the R phase, 10.973% voltage drop percentage on the S phase, 10.167% voltage drop percentage on the T phase. Uprating was carried out on the transformer to reduce overloading. After the uprating was carried out, the loading results were 55.568 % , which was in accordance with the permitted loading standards. The voltage drop percentage value obtained for each phase R, S, T is 10.973%, voltage drop percentage on the R phase, 10.524 % voltage drop percentage on the S phase, 9.637 % voltage drop percentage on the T phase.

Downloads

Download data is not yet available.

Author Biographies

Usaha Situmeang, Universitas Lancang Kuning

Program Studi Teknik Elektro, Fakultas Teknik

Aji Pangestu, Universitas Lancang Kuning

Program Studi Teknik Elektro, Fakultas Teknik

Monice Monice, Universitas Lancang Kuning

Program Studi Teknik Elektro, Fakultas Teknik

References

SPLN No. 50. (1997). Spesifikasi Transformator Distribusi. P.T Perusahaan Listrik Negara.

Soebagio. (2012). Transformator. ITS Press. Surabaya

Yasa, I. W. S., Pacane, I. W. D., & Suriana, I. W. (2023). Mengatasi Overload Pada Transformator Gardu Distribusi Dengan Metode Uprating. Kajian Teknik Elektro, 8(2), 82–91.

Samsurizal, & Hadinoto, B. (2020). Studi Analisis Dampak Overload Transformator Terhadap Kualitas Daya Di PT. PLN(Persero) Up3 Pondok Gede. Kilat, 9(1), 136–142. https://doi.org/10.33322/kilat.v9i1.784

Muchtar, H., & Sopian, Y. (2017). Studi Verifikasi Sistem Ketidakseimbangan Beban Pada Jaringan Tegangan Rendah Menggunakan Alat Phb – Sr (Peralatan Hubung Bagi Sambungan Rumah) Di Wilayah Pln Area Cempaka Putih. Elektum, 14(1). https://doi.org/10.24853/elektum.14.1.1-8

Published
2024-12-31
How to Cite
Usaha Situmeang, Pangestu, A., & Monice, M. (2024). Evaluasi Uprating Transformator Distribusi 20 KV pada Penyulang Kelinci di PT. PLN (Persero) ULP Rumbai. Jurnal Surya Teknika, 11(2), 704-709. https://doi.org/10.37859/jst.v11i2.7907
Abstract views: 50 , *.pdf downloads: 41