Abstract

ABC is a small and medium industry that produces various kinds of shovels. The products produced by UD.ABC are wooden-handled shovels and iron shovels. Every day UD.ABC targets to produce 65 and 45 dozen wooden-handled shovels and iron shovels. But the production target could not be met. One way that targets cannot be met is influenced by the performance and consistency of each operator, therefore it is necessary to determine the standard time for each operator in order to maximize consistency in completion. After calculating the standard time, the standard time for OP1 was 33.25 seconds, OP2.3 14.19 seconds, OP4 33.47 seconds, OP5 23 seconds, OP6 26.59 seconds, OP7.8 29.1 seconds. And additional workers are needed to meet production targets. The additional workforce was carried out at OP4 by 1 person,and OP6 by 1 person.

Downloads

Download data is not yet available.

Author Biographies

Fachril Aliffiansyah, Universitas 17 Agustus 1945 surabaya

Teknik Industri, Fakultas Teknik

Sajiyo Sajiyo, Universitas 17 Agustus 1945 Surabaya

Teknik Industri, Fakultas Teknik

References

sajiyo M, Aziza N, Sholihah Q. Ergonomi Industri. Universitas Brawijaya Press; 2022.

Putra BI. Buku Ajar Analisa Dan Perancangan Sistem Kerja. Umsida Press; 2020.

Wignjosoebroto S. Ergonomi Studi Gerak dan Waktu (IK Gunarta. Guna Widya. 2006;

Kholil AS, Syukron A. Pengantar teknik industri. Yogyakarta: Graha Ilmu; 2014.

Aji Pangestu D. Analisis kebutuhan jumlah tenaga kerja guna meningkatkan kapasitas produksi pada ud. Sukri dana abadi analysis of the number of labor requirements to increase production capacity in ud. Sukri dana abadi [Internet]. 2020. Available from: https://journal.ubm.ac.id/index.php/jiems

Downloads

Published

2024-06-25

How to Cite

[1]
Fachril Aliffiansyah and S. Sajiyo, “Analisis Waktu Kerja untuk Menentukan Jumlah Tenaga Kerja dalam Pemenuhan Permintaan di UD.ABC ”, JST, vol. 11, no. 1, pp. 154–158, Jun. 2024.

Issue

Section

Research Article