Perancangan Usulan Tata Letak Produksi Usaha Kecil Menengah Bata Merah Wiyono
Abstract
This study aims to provide suggestions for improvements to the layout of the Wiyono Red Brick Small and Medium Enterprises so that a more optimal layout is obtained in terms of track distance, simpler material flow, material handling costs, and designing rest areas for workers in the Wiyono Red Brick Small and Medium Enterprises. The Wiyono Red Brick Small and Medium Enterprises are required to make the track distance shorter and material handling costs cheaper. The necessary data was collected by conducting interviews with business owners and making direct observations at the Wiyono Red Brick Small and Medium Enterprises. This study used the Computerized Relative Allocation of Facilities Techniques (CRAFT) method. The results of the analysis using the CRAFT method show that the proposed layout has an alternative OMH layout of Rp.1,464,676.5, while the initial layout is Rp. 2,831,368.1, resulting in a difference of Rp. 1,366,691.6. The total distance of the initial layout is 269,654 m, while the alternative distance is 139,493 m with a difference of 130,161 m. From the results of the comparison, it is found that the difference between the initial layout and the alternative layout is so large that it is necessary to apply the alternative layout to make production more optimal.
Downloads
References
Tarigan EPL, Zetli DS. EVALUASI TATA LETAK FASILITAS DI PT MBG PUTRA MANDIRI YOGYAKARTA 2021;2089:2477–2089.
Suradi, Hanafie A, Haslindah A, M S, Jaja. Re-layout of Material Storage Room at PT. Andalan Fluid System with Allocation Area Diagram Method. Int J Adv Sci Res Eng 2018;4:224–33. https://doi.org/10.31695/ijasre.2018.32972.
Prihono. Re-layout production facility bread using FTC and ARC method in PT. XYZ. J Appl Ind Eng PGRI Adi Buana 2018;01:49–55.
Rachman B. PERANCANGAN TATA LETAK HASIL PRODUKSI BUIS BERDASARKAN ARC 2018.
Sitepu MH, Alda T, Sembiring MT, Nasution A, Ayu NN, Zein MR. Facilities layout design for vise manufacturing using Blocplan. IOP Conf Ser Mater Sci Eng 2020;851. https://doi.org/10.1088/1757-899X/851/1/012037.
Jamalludin J, Ramadhan H. Metode Activity Relationship Chart (Arc) Untuk Analisis Perancangan Tata Letak Fasilitas Pada Bengkel Nusantara Depok. Bull Appl Ind … 2020;2:20–2.
Rofieq M, Erliana K, Wiati NM, Hariyanto S. Redesign of facility layout to reduce the production line distance in MSE Silver 999 Malang. IOP Conf Ser Mater Sci Eng 2021;1034:012124. https://doi.org/10.1088/1757-899x/1034/1/012124.
Astiono RS, Sugianto W. Perancangan Usulan Tata Letak Fasilitas Di Cafe Damascus. Comasie 2020;3:21–30.
Rosyidi MR. Analisa Tata Letak Fasilitas Produksi Dengan Metode Arc, Ard, Dan Aad Di Pt. Xyz. WAKTU J Tek UNIPA 2018;16:82–95. https://doi.org/10.36456/waktu.v16i1.1493.
Santoso, Heryanto RM. Perancangan Tata Letak Fasilitas. 1st ed. Bandung: Alfabeta; 2020.
Safitri ND, Ilmi Z, Amin M. Analisis Perancangan Tataletak Fasilitas Produksi menggunakan Metode Activity Relationship Chart (ARC). J Manaj 2018;9:38. https://doi.org/10.29264/jmmn.v9i1.2431.
Copyright (c) 2023 Filda Yuriski Pratiwi, Elsya Paskaria Loyda Tarigan
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.