Analisis Efisiensi Waktu Proses Pencetakan Jok Bus di PT. XYZ Menggunakan Diagram Pareto dan Fishbone
DOI:
https://doi.org/10.37859/jst.v13i1.11662
Abstract
This study was motivated by the lengthy processing time in the bus seat molding production process at PT. XYZ, which affects manufacturing efficiency. The objective of this research is to identify the activities that contribute most significantly to production time and to analyze the factors causing process delays. The research employs the Pareto Diagram to determine the activities with the greatest contribution to total production time and the Fishbone Diagram to identify the root causes of the problem based on six aspects: human, machine, method, material, environment, and measurement. The results indicate that material mixing, curing, material weighing, and foam injection are the four main activities contributing to more than 80% of the total production time. The Fishbone analysis reveals that insufficient operator training, non-standardized work procedures, material instability, machine disturbances, unfavorable working conditions, and the lack of standardized measurement systems are the primary causes of prolonged production time. The study concludes that the combined application of the Pareto and Fishbone Diagrams is effective in identifying improvement priorities to enhance production time efficiency through the standardization of work procedures, improvement of operator competencies, and regular machine maintenance.
Downloads
References
H. D. Prasetyo and J. A. Szs, “Enhancing Bus Body Assembly Efficiency: Comparative Analysis of Ranked Positional Weight and Region Approach at PT. ABC,” vol. 6, no. 4, pp. 1–9, 2024.
G. Bertocci and D. Ha, “Seating Comfort Analysis: A Virtual Ergonomics Study of Bus Drivers in Private Transportation,” 2020. doi:10.1088/1757-899X/912/2/022018.
Analisis Pengendalian Kualitas Produk Jok Dengan Metode Seven Tools Untuk Mengurangi Kecacatan Produk Di PT ABC, vol. 8, no. 1, 2026.
N. Juli et al., “Pentingnya Standar Operasional Prosedur (SOP) Dalam Meningkatkan Efisiensi Dan Konsistensi Operasional Pada Perusahaan Manufaktur,” vol. 1, no. 3, pp. 2–15, 2024.
V. S. Pasha and J. Chin, “Combination of Value Stream Mapping (VSM) Method and Kanban System to Reduce Time Waste in the Production Process,” vol. 16, no. 1, pp. 76–89, 2024.
R. G. Alkindi et al., “Inovasi dan Efisiensi dalam Proses Produksi Bus: Studi Kasus PT. Laksana Bus Manufaktur,” vol. 2, no. 1, pp. 1–12, 2024.
F. Sumasto et al., “Meningkatkan Produktivitas di Sektor Otomotif (Studi Kasus: Yanto’s Truck Seat Service),” vol. VIII, no. 4, pp. 7356–7369, 2023.
L. Jum, “Analysis of Warehouse Value-Added Services Using Pareto as a Quality Tool,” 2023.
“Jurnal Teknik Industri,” vol. 3, no. 1, pp. 47–52, 2022.
J. Nicholas et al., “Perancangan Bill of Material pada Proses Produksi Minibus di Departemen Perlengkapan Karoseri PT X,” vol. 4, pp. 21–31, 2024.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Fulki Dhafin Rizqan, Dwi Nurul Izzhati

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.