Analisis Beban Kerja guna Menentukan Tenaga Kerja Optimal Plant II di PT. Keramik Diamond Industries Gresik dengan Metode WLA

Authors

  • Yoga Putra Wardana Universitas 17 Agustus 1945 Surabaya
  • Wiwin Widiasih Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.37859/jst.v13i1.11586
Keywords: Analisis Beban Kerja, Tenaga Kerja Optimal, Work Load Analysis, Cardiovascular Load

Abstract

PT. Keramik Diamond Industries is a wall and floor tile manufacturing company required to meet production targets effectively and efficiently. In Plant II, the monthly production target of 400,000 m2 was not achieved from January to July 2025; therefore, an evaluation of labor requirements based on actual workload was needed. This study aims to determine the optimal number of workers in the Body Preparation, Press, Glazing, Kiln, and Grading processes using the Work Load Analysis (WLA) method. Data were collected through direct observation, stopwatch time study, production records, working-hour data, and workers’ pulse-rate measurements. The analysis stages included data uniformity and adequacy tests, cycle time calculation, normal time, standard time, standard output, WLA, and physical workload evaluation using Cardiovascular Load (CVL). The WLA results show that the optimal labor requirement is 36 operators compared with the actual condition of 20 operators, with the highest additional needs found in the Kiln and Body Preparation processes. The average CVL value of 63.92% indicates that work-system improvement is required. Adjusting the number of operators is expected to balance workload and support productivity improvement in Plant II.

Downloads

Download data is not yet available.

Author Biographies

Yoga Putra Wardana, Universitas 17 Agustus 1945 Surabaya

Program Studi Teknik Industri

Wiwin Widiasih, Universitas 17 Agustus 1945 Surabaya

Program Studi Teknik Industri

References

Y. Fernanda, J. Hutabarat, and Kiswandono, "Analisa Beban Kerja dengan Pendekatan Workload Analysis (WLA) untuk Menentukan Jumlah Tenaga Kerja yang Optimal pada Industri Dupa," Jurnal Mahasiswa Teknik Industri, vol. 6, no. 2, 2023, doi: 10.36040/valtech.v6i2.7407.

M. Al Farizi and W. Widiasih, "Evaluasi Penerapan Lean Manufacturing, Beban Kerja Fisik dan Mental pada Divisi Manual Setting," Journal of Industrial and Systems Optimization, vol. 7, no. 1, pp. 39–45, 2024. [Online]. Available: https://pdfs.semanticscholar.org/

N. N. Amaliah, N. F. Azizah, and D. Herwanto, "Pengukuran Produktivitas dan Penetapan Waktu Standar pada Produksi Pallet Menggunakan Time Motion Study di PT XYZ," vol. 15, no. 1, Mar. 2025, doi: 10.36040/industri.v15i1.12451.

S. Asarela and P. R. Sari, "Analisis Pengukuran Kerja Menentukan Waktu Baku Menggunakan Metode Jam Henti terhadap Operator Persiapan Komponen (Studi Kasus: PT XYZ)," vol. VIII, no. 3, 2023. [Online]. Available: https://pdfs.semanticscholar.org/87ac/37d55b6a81de15f545cd9c6b02c9d0f34b55.pdf

U. Juwardi et al., "Perhitungan Waktu Baku dan Penentuan Produktivitas pada Pengerjaan Pembersihan Kaca Gedung X," Jurnal Konversi Energi dan Manufaktur, vol. 8, Jan. 2023, doi: 10.21009/JKEM.8.1.8.

A. D. Utama, T. A. Nugraha, and R. Wahyudi, "Penentuan Waktu Baku Optimal dan Analisis Beban Kerja pada Bagian Produksi Udang PCDTO-IQF di PT. Indo American Seafoods," PASTI, vol. XVII, no. 2, pp. 150–163, Aug. 2023, doi: 10.22441/pasti.2023.v17i2.002.

H. Novantoro and M. Singgih, "Analisis Beban Kerja dan Penentuan Jumlah Karyawan Divisi Produksi dalam Menyelesaikan Target dari Perusahaan (Studi Kasus PT. ABC)," Jurnal Ilmiah Teknik dan Manajemen Industri, no. 1, Jul. 2023, doi: 10.46306/tgc.v3i1.116.

R. A. Firnanda and H. Murnawan, "Penentuan Jumlah Tenaga Kerja pada UD Surya Sejati dengan Metode Workload Analysis (WLA)," Jurnal Ilmiah Teknik dan Manajemen Industri, vol. 3, no. 2, pp. 1384–1399, 2023, doi: 10.46306/tgc.v3i2.

C. P. Manurung, I. Sujana, and H. Batubara, "Pengukuran Beban Kerja Mental dan Beban Kerja Fisik Berdasarkan Metode NASA-TLX dan CVL pada Karyawan UMKM XYZ," Integrate: Industrial Engineering and Management System, vol. 6, no. 2, pp. 16–21, 2022. [Online]. Available: https://jurnal.untan.ac.id/index.php/jtinUNTAN/issue/view/1913