Analisis Sistem Penjadwalan Perawatan Mesin Penggiling Kedelai pada UMKM Tahu Wijaya
DOI:
https://doi.org/10.37859/jst.v12i2.10438
Abstract
Tahu Wijaya, a micro, small, and medium enterprise (MSME), relies on soybean grinding machines as the main equipment in its production process. However, the high frequency of machine failures results in recurring downtime, thereby disrupting production continuity. This study aims to determine an optimal maintenance schedule for the soybean grinding machines to minimize downtime and improve production efficiency. The method used in this study is Reliability Centered Maintenance (RCM), beginning with the collection of primary data through observation, interviews, and questionnaires, along with secondary data from machine downtime records. Risk analysis of machine failures was conducted using the Failure Mode and Effect Analysis (FMEA) method to obtain the Risk Priority Number (RPN) for each machine component. The results showed that the grinding stone was the component with the highest RPN of 256, followed by the motor with 168 and the adjustment bolt with 150. Additionally, the calculations of Mean Time to Failure (MTTF) and Mean Time to Repair (MTTR) yielded values of 22.55 hours and 1.5 hours, respectively. Based on these analyses, the ideal preventive maintenance interval was established before the machine reached 244 operating hours. This study concludes that the application of the RCM method is effective in producing a data-driven machine maintenance schedule that reduces potential downtime, thereby supporting smooth and continuous production at Tahu Wijaya MSME
Downloads
References
R. Soesilo, A. D. Valentin, and A. Ramadhani, Proses Manufaktur Modern: Memahami Proses dan Metode Produksi. MEGA PRESS NUSANTARA, 2024.
L. Suryani, “Strategies For Optimizing Efficiency And Productivity In Scheduling Company Activities,” Int. J. Econ. Educ. Entrep., vol. 4, no. 1, pp. 140–147, Apr. 2024, doi: 10.53067/ije3.v4i1.243.
F. Corral, E. Forcael, and R. Linfati, “Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context,” Heliyon, vol. 9, no. 6, p. e16745, Jun. 2023, doi: 10.1016/j.heliyon.2023.e16745.
M. Gustiawan and N. Affandi, “Perencanaan Ulang Penjadwalan Perawatan Mesin Extr Uder Menggunakan Metode Reliability Centered Maintenance Di Pt Staedter Indonesia,” J. Ilm. Tek. dan Manaj. Ind., vol. 1, no. 2, pp. 255–270, Dec. 2021, doi: 10.46306/tgc.v1i2.20.
T. Anggara, P. Pratikto, and A. A. Sonief, “Penjadwalan Perawatan dengan Metode Campbell Dudel Smith (CDS) untuk Meningkatkan Produksi Mesin Recycle Waste Tembakau,” J. Rekayasa Mesin, vol. 11, no. 1, pp. 105–115, May 2020, doi: 10.21776/ub.jrm.2020.011.01.12.
C. T. N. Siregar, P. Kindangen, and I. D. Palandeng, “Evaluasi Pemeliharaan Mesin dan Peralatan Produksi PT. Multi Nabati Sulawesi (MNS) Kota Bitung,” J. EMBA J. Ris. Ekon. Manajemen, Bisnis dan Akunt., vol. 10, no. 3, p. 428, Jul. 2022, doi: 10.35794/emba.v10i3.42362.
A. Setiawan and Y. M. K. Aritonang, “Penerapan Metode Reliability Centered Maintenance (RCM) untuk Menentukan Strategi Perawatan Fasilitas Produksi Kain,” J. Telemat., vol. 8, no. 1, p. 8, Jun. 2013, doi: 10.61769/telematika.v8i1.64.
M. R. Akbar, Suparto, and W. Widiasih, “Analisis Perawatan Mesin Bubut dengan Metode Preventive Maintenance Guna Menghindari Kerusakan Secara Mendadak dan Untuk Menghitung Biaya Perawatan.,” J. SENOPATI, vol. 4, no. 1, pp. 32–45, 2022.
F. Pohan, I. Saputra, and R. Tua, “Scheduling Preventive Maintenance to Determine Maintenance Actions on Screw Press Machine,” J. Ris. Ilmu Tek., vol. 1, no. 1, pp. 1–12, May 2023, doi: 10.59976/jurit.v1i1.4.
S. Umam and W. Widiasih, “Penjadwalan Perawatan Mesin Grading Plant II di PT Keramik Diamond Industries Gresik dengan Metode RCM,” J. Tekst. J. Keilmuan dan Apl. Bid. Tekst. dan Manaj. Ind., vol. 7, no. 1, pp. 47–58, Jun. 2024, doi: 10.59432/jute.v7i1.91.
A. A. Bukhori, A. Herlambang, and T. Rezaldy, “Analisa Penjadwalan Perawatan Mesin Produksi Dengan Metode Reliability Centered Maitenance (RCM) Pada PT. Rubber Hock Lie,” SAFARI J. Pengabdi. Masy. Indones., vol. 2, no. 4, pp. 119–131, Oct. 2022, doi: 10.56910/safari.v2i4.454.
I. Paprocka, W. M. Kempa, and G. Ćwikła, “Predictive Maintenance Scheduling with Failure Rate Described by Truncated Normal Distribution,” Sensors, vol. 20, no. 23, p. 6787, Nov. 2020, doi: 10.3390/s20236787.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Anggia Arista, Syah Fery Zaki Sumbara, Zefri Azharman

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

















